THE PT2 COOLING TOWER
The PT2 Cooling Tower is a great replacement unit that highlights BAC’s commitment to easy maintenance and installation. The units also reduce energy consumption with premium efficient motors, are easy to install with a single piece lift and BAC’s InterLok™ System, have a wind load rating of 130 psf, and are seismically verified up to an SDS of 2.93g at grade
Description
THE PT2 COOLING TOWER of BAC brings you the most advanced counterflow, induced draft cooling tower in the industry. Engineered with input from end users, the PT2’s design highlights BAC’s commitment to ease of maintenance, low installation costs, reduced energy consumption and durable construction. Offering a compact footprint for low to medium tonnage requirements, the PT2 provides an efficient solution for installations with space constraints.
*LOW ENVIRONMENTAL IMPACT
– Energy efficient
- All units meet or exceed ASHRAE Standard 90.1 energy efficiency equirements
- Premium efficient/inverter duty fan motors
– Sound Reduction Options
- Standard fan is high efficiency and low sound
- For further reduced sound levels, Low Sound Fans and sound attenuation are available (optional)
*EASY MAINTENANCE
– External motor adjustment with included wrench
– Inward sliding access doors do not limit workspace
– External platforms and ladders improve accessibility (optional)
– BranchLok™ Removal System allows for tool-less spray branch removal
– Easily accessible cleanout port flushes water distribution debris to outside the unit
– Louvers are easily removed without tools
– Removable inspection panels allow for easy inspection and access to the fill (optional)
*RELIABLE AND DURABLE CONSTRUCTION
– PT2-1218 models have a standard two fan mechanical which provides redundancy
- Ideal for critical applications
– Seismically verified through dynamic shake table testing up to a SDS of 2.93g at grade
– Meets wind and seismic requirements of the 2009 International Building Code (IBC)
– Listed on California’s Office of Statewide Health Planning and Development (OSHPD) pre-approved equipment list
– Enhanced longevity with a variety of materials of construction
*IDEAL REPLACEMENT UNIT
– Units are designed to mount directly on the existing support steel of both crossflow and counterflow cooling towers
– Fan motor configurations can be supplied to match existing wiring
*LOW INSTALLED COST
– Single piece lift available on all models
– Models ship in multiple sections to minimize the size and weight of the heaviest lift, allowing for use of smaller, less costly cranes
– BAC’s InterLok™ System aligns the casing and the basin to expedite rigging and requires no sealer tape
– Factory pre-assembled platforms reduce installation time (optional)
*Unique Feature of The PT2 Cooling Tower and other Cooling Tower series of BAC
Reviews
There are no reviews yet.